Projects & News
Blog 2005 / Page 1 of 1
|
|
Hungry
Jack's / Milsons Point
December 2005
Client:Hungry Jack's Pty Limited
Brief:Furniture removal.
Info:Remove all furniture from former head office to the new location at William St.
Time to complete:Jan 10 2005 - Jan 12 2005
RS posted this on 13/12.
|
|
Taiyo
Membrane Co. / SACL
December 2005
Client:Taiyo Membrane Corporation
Brief:Civil works on existing shade structure.
Info:Concrete encasing of steel columns for shade structure carried out at the Long Term car park at Sydney Airport.
Time to complete:Dec 06 2006 - Dec 09 2006
Nat posted this on 09/12.
|
|
Wilson
Parking / Sydney
December 2005
Client:Wilson Parking
Brief:Replace daylight tubes with tri-phosphorous.
Info:Work carried out over 2 days within the MLC car park.
Time to complete:Dec 01 2006 - Dec 05 2006
JK posted this on 06/12.
|
|
Sydney
Airport
November 2005
Client:Sydney Airport Corporation Ltd
Brief:Demolish an existing footpath to create a new double driveway.
Info:Following a new
configuration of car spaces for all car rental companies. With just two
days notice and 24-hours to turnaround time, a double driveway replaced
the footpath. This allowed Hertz and Avis cars to exit onto the main
road in front of the Qantas Terminal (T3).
Time to complete:Nov 28 2005 - Nov
29 2005
JK posted this on 29/11.
|
|
Hungry
Jack's / West Gosford
November 2005
Client:Hungry Jack's Pty Limited
Brief:Supply and install a new structural steel tower.
Info:To accommodate for the raising of height of an existing sign, a structural steel tower on the roof of the restaurant was installed.
Time to complete:Nov 18 2005 - Nov 22 2005
JK posted this on 22/11.
|
|
New
Yoshinoya / Hurstville
November
2005
Client:Yoshinoya Pty Ltd
Project Management:Clifton Development
Consultants
Brief:Fitout of an existing tenancy for a
new Yoshinoya restaurant.
Time to complete:Nov 14 2005 - Dec 12 2005
JK posted this on 13/12.
|
|
Hungry
Jack's / Parramatta
November 2005
Client:Hungry Jack's Pty Limited
Brief:Make good of Parramatta Mall store.
Info:Removal of equipment, demolition, and making good of all floors, walls and ceilings.
Time to complete:Nov 10 2005 - Nov 25 2005
JK posted this on 25/11.
|
|
Wilson
Parking / Sydney
October 2005
Client:Wilson Parking
Brief:Upgrade entire lighting at Australia Square car park.
Time to complete:Oct 07 2006 - Oct 10 2006
JK posted this on 11/10.
|
|
Menzies Aviation World Cargo
October 2005
Client:Menzies Aviation World Cargo
Brief:Repair asphalt area inside the warehouse at Sydney Airport.
Time to complete:Oct 06 2006 - Oct 08 2006
JK posted this on 08/10.
|
|
Hertz
Australia Ltd / Haberfield
September 2005
Client:Sinclair Knight Merz
Brief:Refurbishment of Hertz's car sales showroom.
Info:This total refurbishment included; air conditioning, carpentry, painting, gardening, pavement works, cleaning and minor building works.
Time to complete:Sep 29 2005 - Nov 01 2005
Col posted this on 02/11.
|
|
Construction
/ Owen St.
Wentworthville
September 2005
Client:Private investors
Project Management:Vegagroup.
Brief:Design, construct & project manage a
residential project comprised of two upmarket residences.
Time to complete:Sep 2005 - May 2006
Stv posted this in May 2006.
|
|
Hungry Jack's / Sylvania
September 2005
Client:Hungry Jack's
Project Management:Vegagroup.
Brief:Project management, civil works, hydraulics
and landscaping at the Sylvania restaurant.
Time to complete:Sep 12 2005 - Oct 14 2005
JK posted this on 14/10.
|
|
Jones
Lang LaSalle / MLC Car park
August 2005
Client:Jones Lang LaSalle Pty Ltd
Brief:Supply and install curbs dividing the loading dock access way at the MLC car park.
Time to complete:Aug 13 2005 - Aug 14 2005
JK posted this on 14/08.
|
|
Hungry
Jack's / 42 Locations
July 2005
Client:Hungry Jack's
Brief:Implementation of project "Refresh".
Info:Implementation of HJ's corporate colours
on 42 stores throughout the North Coast, Sydney Metro and the South Coast.
Time to complete:Jul 15 2005 - Oct 09 2005
Col posted this on 10/10.
|
|
Wilson
Parking / Opera House
July 2005
Client:Wilson Parking
Brief:Attend to an emergency flooding.
Info:Response within the hour to deal with
this emergency and make safe the lift room at the Opera House car park.
Time to complete:Jul 15 2005 - Jul 15 2005
JK posted this on 15/07.
|
|
Hungry
Jack's / Canberra Centre
July 2005
Client:Hungry Jack's
Brief:Refurbishment of the restaurant's serving area.
Info:Works incorporated lighting, painting,
neon lights, furniture etc.
Time to complete:Jul 12 2005 - Aug 21 2005
Col posted this on 22/08.
|
|
Sydney Airport Corporation Ltd
June 2005
Client:Sydney Airport Corporation Limited
Brief:Construct a designated smokers zone at SACL's new head office.
Time to complete:Jun 25 2005 - Jun 26 2005
JK posted this on 26/06.
|
|
Sydney Airport Corporation Ltd
June 2005
Client:Sydney Airport Corporation Limited
Brief:Civil works upgrading the valet car park area at the International Terminal, departure level.
Time to complete:Jun 09 2005 - Jun 16 2005
JK posted this on 16/06.
|
|

Performis / Norwest
June 2005
Client:Hospitality Dimensions t/a Performis
Project Management:Vegagroup.
Brief:Design, construct and fit-out the NSW head office.
Info:Nestled within the Norwest Central Business Park at Baulkham Hills, Performis headquarters is a modern, functional and light filled space.
The project's aim was to design and construct a commercial workspace, which affords
the occupants a healthy and stimulating work environment.
The required trades
for this project were as follows: Fit-out contractors; Glazing/Aluminium for
windows & frames; Building works (Stud walls and fibro sheeting); Mechanical;
Essential services; Electrical & Data cabling; Painting; Floor covering.
Size:320m2
Time to complete:Jun 02 2005 - Jun 25 2005
JK posted this on 26/06.
|
|

Sydney Airport Corporation Ltd
June 2005
Client:Sydney Airport Corporation Limited
Brief:Design and construct two new paved areas with shade structures at the Domestic and International Terminals.
Time to complete:Jun 01 2005 - Jul 28 2005
JK posted this on 28/07.
|
|
Joe
Khoury / SMH 1/2 Marathon
May 2005
Event: SMH 1/2 Marathon
Info: Race started at 07:30am.
Time to complete: 94 minutes.
JK posted this on 22/05.
|
|

Hungry
Jack's / Warwick Farm
April 2005
Client:Hungry Jack's
Project Management:Clifton Development Consultants Pty Ltd.
Brief:Repair damage to the drive-thru attendant area.
Info:Following a car crashing into the drive-thru
window, repair works needed to be performed overnight so the store is ready
for business the next day.
Luckily no one was hurt in this incident, but the damage caused
dramatically affected the drive thru operation, and created
inconveniences for customers and the business activities.
On the same day, Vega was contacted to assess the damage and provide estimate
for the completion timeline and costs. Our tradespeople showed up by lunchtime
and proceeded to clearing the debris and securing the damaged area for that day.
The
required trades for this repair work were as follows; Demolition and removal
of damaged areas; Glazing/aluminium for windows & frames; Building works (stud
walls and fibro sheeting); Water proofing; Electrical; Painting.
The actual repairs
work started early 6:00am the next day, and all the trades involved showed up
as scheduled. The drive through window was ready before lunchtime.
Time to complete:Apr 29 2005 - Apr 30 2005
JK posted this on 30/04.
|
|

Hungry
Jack's / Minchinbury
April 2005
Client:Hungry Jack's
Project Management:Clifton Development Consultants Pty Ltd.
Brief:Supply, install and certify a new speaker box awning for drive-thru.
Time to complete:Apr 24 2005 - Apr 28 2005
JK posted this on 29/04.
|
|
Wilson
Parking / Sydney Opera House
April 2005
Client:Wilson Parking
Brief:Full upgrade of the lighting system.
Time to complete:Jul 22 2005 - Jul 26 2005
JK posted this on 26/04.
|
|
Hungry
Jack's / Leumeah
April 2005
Client:Hungry Jack's
Brief:Supply and install a shade structure.
Time to complete:Apr 19 2005 - Apr 21 2005
JK posted this on 21/04.
|
|
Joe
Khoury / Canberra Marathon
April 2005
Event: Canberra Marathon
Info: Race started at 07:00am.
Time to complete: 3 hrs 42 minutes.
JK posted this on 10/04.
|
|
Tuscan Corporation / Millers Point
March 2005
Client:Tuscan Corporation Limited
Brief:Maintenance & painting of various areas
in the new building.
Time to complete:Mar 22 2005 - Mar 25 2005
JK posted this on 25/03.
|
|
Wilson
Parking / MLC
March 2005
Client:Wilson Parking
Brief:Light fittings upgrade throughout car park.
Time to complete:Mar 22 2005 - Mar 25 2005
JK posted this on 22/03.
|
|
Sydney Airport Corporation Ltd
March 2005
Client:Sydney Airport Corporation Limited
Brief:Colour matching & coding of areas at
the Long Term car park.
Time to complete:Mar 04 2005 - Mar 07 2005
Ant posted this on 07/03.
|
|
Hungry
Jack's / Kings Cross
February 2005
Client:Hungry Jack's
Brief:Remove equipment.
Time to complete:Feb 22 2005 - Feb 25 2005
Col posted this on 21/04.
|
|
|