Northern Sydney Central
Coast Health
Royal North Shore Hospital
April 2007
Client:Northern Sydney Central Coast Health
Project Management:Vegagroup
Brief:Car park maintenance work
Info:To ensure car park grounds are adequately maintained through provision of maintenance and general repair services carried out through a scheduled preventative maintenance program.
Time to complete:Apr 29 2007 - Apr 29 2007
Steve posted this on 29/04.
Link:http://www.nscchealth.nsw.gov.au
|
   |

Hungry Jack's
Canberra Centre
April 2007
Client:Hungry Jack's
Project Management:Beraldo Design
Brief:Front counters upgrade
Info:A refresher upgrade of front counter
surfaces using Corian® tops from Dupont. Associated works included new
black & white glass with signal red, stainless steel channels, angles
and skirting.
The works was carried out after hours for minimum disruption
on store operations.
Corian® was chosen for its durability, aesthetic
appearance, and warmth. It is also flexible with no open joins achieving
the smooth final shape appropriate for this particular installation.
Time to complete:Apr 23 2007 - Apr 24 2007
James / Ant posted this on 25/04.
Links:http://www.hungryjacks.com.auhttp://www.beraldodesign.com.auhttp://www.dupont.com.au
|
       |

Sydney Airport
Long Term Carpark (LTCP)
April 2007
Client:Sydney Airport Corporation Ltd
Project Management:Vegagroup
Brief:Linemarking improvements at the LTCP
Info:General linemarking, numbering and stencilling of the new Valet Parking area at the Long Term Carpark.
Time to complete:Apr 21 2007 - Apr 29 2007
Ant posted this on 29/04.
Link:http://www.sydneyairport.com.au
|
   |


Centro Properties Group
Bankstown
April 2007
Client:Centro Properties Group
Project Management:Vegagroup
Brief:De-fit of ex Urban store
Info:On commencing of works, site induction took place and the surrounding area was safety prepared; necessary for work to proceed in earnest.
We identified and isolated building services, from electricity and water as well as fire and mechanical services.
This particular defit required the demolition of walls, the dismantling of a solid steel staircase leading to a 2nd level as well as support metal structure beams.
Collective demolition debris was removed offsite.
Other make good building works included wall building, gyprocking and air-conditioning.
Time to complete:Apr 10 2007 - Apr 27 2007
James posted this on 25/04.
Link:http://www.centro.com.au
|
          |

Wilson Parking / Sydney
P21 / Citipark
April 2007
Client:Wilson Parking
Project Management:Vegagroup
Brief:Electrical inspection, Lighting maintenance & upgrade
Info:A rapid response upgrade works was
carried out on lights at various levels of the carpark, including emergency
lighting. Lighting levels throughout the carpark was increased to give
a higher light output for the same wattage lamps used.
Citipark is suitably
located next to Darling Harbour, Cockle Bay, Sydney Aquarium, Queen Victoria
Building and Darling Park.
Time to complete:Apr 01 2007 - Apr 04 2007
Steve posted this on 05/04.
Link:http://www.wilsonparking.com.au
|
   |

Wilson Parking / Sydney
P139 / Opera House
March 2007
Client:Wilson Parking
Project Management:Vegagroup
Brief:Electrical inspection, Lighting maintenance & upgrade
Info: To keep car park operations as smooth as possible, the electrical
and lighting maintenance works was undergone after hours. Following
a comprehensive lighting inspection, various upgrade & replace works was
carried out on tube holders, ballasts and light tubes.
The level of activities associated
with the Sydney Opera House and its surrounding areas incur much demand
on an already busy carpark. It already experience high volume activities
serving visitors and residents of East Circular Quay and Macquarie
Street.
Time to complete:Mar 28 2007 - Apr 02 2007
Steve posted this on 02/04.
Links:http://www.wilsonparking.com.au
http://www.sydneyoperahouse.com
|
   |

Sydney Airport
Domestic Multi Storey Carpark (DMSCP)
March 2007
Client:Sydney Airport Corporation Ltd
Project Management:Vegagroup
Brief:Linemarking improvements at the DMSCP
Info:General linemarking of various carpark zones, including safety lines (specific OH&S linemarking) and traffic management. This work streamlined traffic and improved safety while reflecting the high standards expected at Sydney Airport.
Time to complete:Mar 21 2007 - Mar 24 2007
Ant posted this on 25/03.
Link:http://www.sydneyairport.com.au
|
   |

d'Albora Marinas
Cabarita Point Marina
March 2007
Client:d'Albora Marinas
Project Management:Vegagroup
Brief:Galvanised steel and timber repairs
Info:Preparation works and repairs undertaken
on dislodged beams including the dismantling of old post brackets and
replacing with new galvanised material affixed onto the concrete pillar.
Considering
the close proximity to exposed marine environments, the treated timber,
hot dipped galvanised fasteners and dynabolts will afford the necessary
protection from corrosion thus ensuring that the maximum service life
will be achieved.
Did you know that Cabarita Point Marina offers first
class marina facilities in a beautiful parkland setting?
A waterfront
leisure destination beyond compare, Cabarita Point Marina is located
on the Parramatta River. Cabarita Point is the western gateway to Sydney
Harbour.
Time to complete:Mar 20 2007 - Mar 22 2007
Joe posted this on 23/03.
Link:http://www.dalboramarinas.com.au
|
             |

Centro Properties Group
Bankstown
March 2007
Client:Centro Properties Group
Project Management:Vegagroup
Brief:De-fit of ex Shoo Biz store
Info:Vegagroup was commissioned to de-fit and make good of the Shoo Biz store. This included the removal of the timber extension of the mezzanine floor while the existing slab and masonry remains.
Time to complete:Mar 15 2007 - Mar 21 2007
James posted this on 22/03.
Links:http://www.centro.com.auhttp://www.figgins.com.au
|
   |

Centro Properties Group
Bankstown
February 2007
Client:Centro Properties Group
Project Management:Vegagroup
Brief:De-fit of ex Sleep In Beauty
Info:Vegagroup was commissioned to de-fit and make good of the store, with operations performed after-hours. This included the removal of timber floorboards back to slab, the wall dividing the storeroom and the main store area, as well as electrical works and the entire shopfront.
Time to complete:Feb 24 2007 - Feb
26 2007
James posted this on 27/02.
Link:http://www.centro.com.au
|
 |

Wilson Parking / Sydney
P155
/ 155 George St.
February 2007
Client:Wilson Parking
Project Management:Vegagroup
Brief:Painting and lighting upgrade
Info:Revamp painting surfaces for the entire
car park and upgrade all lighting to Tri-phosophorous daylight tubes.
Also intense maintenance work and high-pressured degreasing followed by a complete machine scrub was carried out on grease affected ground surfaces as well as the entire car park grounds.
Wilson Parking's P155 is conveniently located next door to Sydney's most visited destinations; Sydney Opera House, Sydney Harbour Bridge, Museum of Contemporary Art and the Botanical Gardens. Even the Queen Victoria Building and the many CBD shops are just a 20 minutes walk.
You can park your car; catch the ferry to Manly Beach, the bus to Bondi and other city beaches, or the train at Circular Quay station to various city attractions.
Time to complete:Feb 14 2007 - Feb
28 2007
JK posted this on 28/02.
Links:http://www.sydneyferries.info
http://www.sydneybuses.info
http://www.cityrail.info
|
|

Wilson Parking / Sydney
P127
/ 1 Alfred St.
February 2007
Client:Wilson Parking
Project Management:Vegagroup
Brief:Painting and lighting upgrade
Info:The building has undergone a range of refurbishments
over the years; most recent works carried out by Vegagroup include
new finishes to the entire basement car park (112 car spaces), from
two-tone colour code painting to lighting and light fittings.
Ideally located, 1 Alfred
Street benefits from dazzling views, both across the harbour and city
landscape. It is an iconic and landmark 26 level office building located
at the gateway of Sydney Harbour at Circular Quay.
1 Alfred Street
is home to various retail outlets on its Ground floor, including Starbucks,
Boutique Wine Store, Commonwealth Bank, Restaurant / Cafe, and a convenient
rear lane Loading Dock.
Time to complete:Feb 01 2007 - Feb
13 2007
JK posted this on 14/02.
|
|

Sydney Airport
Taxi
holding area
January 2007
Client:Sydney Airport Corporation Ltd
Project Management:Vegagroup
Brief:Line marking for the upgraded
taxi holding area
Info:Vegagroup implemented the car park's
line markings following the new design.
Time to complete:Jan 21 2007 - Ongoing
James / Ant posted this on 28/01.
Link:http://www.sydneyairport.com.au
|
|
Hungry Jack's
Dubbo
January 2007
Client:Hungry Jack's
Project Management:Beraldo Design
Brief:Restaurant upgrade
Info:This incorporated the upgrading of
the enclosure fence for the outdoor, playground and soft fall areas.
Also extending the concrete slab floors for the exterior seating & playground
areas. Different site works also included tiling, painting, landscaping,
car park line markings, drainage etc.
Time to complete:Jan 14 2007 - Mar
01 2007
Col posted this on 02/03.
Links:http://www.hungryjacks.com.au
http://www.beraldodesign.com.au
|
      |

Sydney City Council
Goulburn Street Car park
January 2007
Client:Sydney City Council
Project Management:Vegagroup
Brief:Handicap parking bays refurbishment
Info:Vegagroup was recently engaged for
the refurbishment of the handicap parking bays at the Goulburn St.
Parking Station. Due to the level of traffic at this parking station,
the works were carried out after hours with total compliance with all regulatory requirements.
Goulburn Street Parking Station serves a number of city highlights
like Hyde Park, the Anzac Memorial, World Square, Sydney Dental Hospital,
Capitol Theatre, Chinatown, Central Station, Downing Centre, Family
Law Courts etc.
For mobility limited persons being dropped off or picked
up in the City, Goulburn Street Parking Station is ideal if you need
comfortable parking 7 days a week (Situated at the corner of Goulburn
and Elizabeth Street.)
Prior to leaving your home and to keep parking hassles
to a minimum, please plan your trip into the City using the City of
Sydney and the RTA's websites.
Time to complete:Jan 06 2007 - Jan
07 2007
James / Ant posted this on 07/01.
Links:http://www.cityofsydney.nsw.gov.au
http://www.rta.nsw.gov.au
|
|

|
Results