Projects & News
Blog 2006 / Page 1 of 1
|
|
Hungry Jack's
Hornsby
December 2006
Client:Hungry Jack's
Project Management:Clifton Development
Brief:Completion of store make good
Info:This included the removal of all equipment,
furniture and signs and making good of all walls, ceilings and floors.
Trades involved included plumbing, gyprocking, tiling, painting, electrical,
air-conditioning and mechanical.
The store was handed over one week ahead
of schedule.
Time to complete:Dec 29 2006 - Jan
25 2007
James posted this on 26/01.
Link:http://www.hungryjacks.com.au
|
|
Grosvenor Freeholds
P84 Cinema Centre / 521 - 527 Kent St.
December 2006
Client:Grosvenor Freeholds Pty Limited
Brief:Remedial work for building facade
Project Management:Vegagroup
Info:Certain segments of the building's external brick walls appeared lacking verticality. Vegagroup undertook remedial building work and redecoration.
Time to complete:Dec 20 2006 - Dec 23 2006
JK posted this on 23/12.
|
|

GPO Sydney
No. 1 Martin Place
December 2006
Client:GPO Sydney No. 1 Martin Place
Project Management:Vegagroup
Brief:Maintenance and re-painting works within the main car
park
Info:Vegagroup was engaged for maintenance and re-painting works within the main car
park. We installed special reflectors to separate incoming traffic
and colour-code painted various locations (Line marking of arrows, pedestrian
crossings and loading dock.)
No. 1 Martin Place is one of Sydney's
finest heritage-listed buildings (circa 1874).
It offers its daily visitors
glimpses of Sydney's early days of European settlement.
This grand old General Post Office building has been a traditional meeting place
for more than a century and remains a popular address.
Visit No. 1 Martin
Place and discover chic boutiques, smart commercial outlets and a rich
choice of culinary experiences. You will find the famous GPO Clock
Tower, Colonial Artifacts at the Tank Stream exhibit, restaurants,
cafes, bars and fashion boutiques.
You can go on for hours enjoying a relaxed
atmosphere. What would you expect to find? Havana House, Xile, Zoya
Carmen, Herringbone, Endota Day Spa, Anthea Crawford, GPO Restaurants
and Bars, Prime Restaurant, Post Brasserie, No. 1 The Health Club and
for your convenience, Travelex ATM and Australia Post Shop.
Time to complete:Dec 20 2006 - Dec 20 2006
James / Ant posted this on 21/12.
Link:http://www.gposydney.com
|
|

Sydney Airport
December 2006
Client:Sydney Airport Corporation Ltd
Brief:Barrier fencing for pedestrians safety in the busy taxi pick up area
Project Management:Vegagroup
Info:Erect new fencing
to increase pedestrian safety near high traffic areas. It comprised of a
welded pipe rail fencing at the Domestic terminal (T2) and a commercial pool
fencing at the International Terminals (T1).
Time to complete:Dec 17 2006 - Dec 29 2006
JK posted this on 30/12.
Link:http://www.sydneyairport.com.au
|
|

Air Canada
December 2006
Client:Air Canada
Brief:Renewal of carpet surfaces at Air Canada's Sydney Airport office
Project Management:Vegagroup
Info:Vegagroup was contracted
to install new carpeted surfaces at Air Canada offices at Sydney Airport.
Air
Canada is currently the 14th largest commercial airline in the world, with a
fleet of 198 aircrafts. In Australia, Air Canada offers international flights
only from Sydney's Kingsford Smith International Airport.
Time to complete:Dec 17 2006 - Dec 17 2006
James posted this on 17/12.
Link:http://www.aircanada.com/au
|
|

Hungry Jack's
Ashfield
December 2006
Client:Hungry Jack's
Project Management:Beraldo Design
Brief:Roofing the restaurant's service area
Info:Carried out a 35m 2 corrugated colour
bond roof installation over the restaurant's service area. Trades involved
were carpenters, roofers and plumbers. Special thanks for the great
performance of carpenter Adam Vetaloni.
Time to complete:Dec 04 2006 - Dec
12 2006
James posted this on 14/12.
Link:http://www.hungryjacks.com.au
|
|

JetStar Airways
November 2006
Client:JetStar Airways Pty Limited
Brief:Readying JetStar's International operations
office at Sydney Airport's T1
Project Management:Vegagroup
Info:Vegagroup was contracted
to perform painting work and make good of JetStar offices at Sydney Airport.
Jetstar
is Australia's and Singapore's new low fares airline for Australia and the Asia-Pacific.
They started flying within Australia on the 25th of May, 2004. This office was
established to cater for their international operations covering Hawaii and
Phuket.
Time to complete:Nov 06 2006 - Nov 07 2006
Tony posted this on 08/11.
Link:http://www.jetstar.com
|
|

Joe Khoury
Eurasia Marathon / Istanbul
November 2006
Event:Eurasia Marathon
Info:This marathon is the marathon
where two continents meet. The Eurasia Marathon is organized by Istanbul’s
Municipality. It starts from the Anatolian side of Istanbul and ends at
the European side, crossing the most beautiful spots in Istanbul. The
Bosphorus River flows right alongside you as you run across roads and
bridges.
Running at Istanbul was a challenge as the temperature was minus 3
degrees at 09:00am and it felt gradually colder as we sweated through
the race, which even felt longer than usual (The weather bureau forecast
was about 9 Celsius.).
So going slowly, I had plenty of time to gaze
at the scenery and think about what makes Istanbul special as one-foot
chased the other on the flat asphalt surface.
I ran passed the blue
mosque of Hagia Sophia and in all crossing three bridges, one over the
Bosphorus and two over the Golden Horn linking the European section of
Istanbul.
What a place this town is, capital of 3 empires.
I was definitely looking forward for a good rub & scrub afterward,
but feeling cold and exhausted I retired to a hot Turkish bath in my hotel.
JK posted this on 05/11.
Link:http://www.istanbulmarathon.org.tr
|
|

Hungry Jack's
Macquarie Centre
October 2006
Client:Hungry Jack's
Project Management:Beraldo Design
Brief:Upgrade of store front counter
Info:Macquarie Centre is located north
of the Sydney CBD at North Ryde. The centre covers more than 95,000m 2
and has 240 specialty stores over four levels and is managed by AMP
Capital Shopping Centres.
The refurbishment of the centre’s popular
Food Court is now complete, and customers are already enjoying the
improved layout and wider choice of food outlets, with a total of 18 stores.
Refurbished
stores include Jamaica Blue, Appetito's, RJ's Sandwich Works, Tandoori
Connection, Bamboo Garden, Ken's Bento Box, Xquisito, Hungry Jack’s
and Donut King, which have also relocated to a new kiosk.
Vegagroup
was engaged for the upgrade of Hungry Jack’s front
counter. The new look featured red colour glass front complementing
white Corian counter tops. Also the elimination of the front store
shutters thus maximising visibility.
Vegagroup coordinated with the centre management (AMP) for site induction,
access to loading docks, and acceptable hours of work and security
arrangements for after hours.
Vegagroup operated after hours and through the night, making the store
ready for POS installation the next day.
Commenting on the overall
upgrade of the Food Court, Centre manager for Macquarie Centre Michael
Wappett said, “A trip to Macquarie
Centre wouldn’t be complete without a visit to one of the many
food outlets in the Food Court. With this in mind, we’ve given
the Food Court a fashionable makeover so that customers can enjoy
its new contemporary ambience, improved amenities and food choices.
We believe that the Food Court will become a destination in itself
for customers to relax, take time out from the shops, and enjoy a
tasty bite with a choice of delicious food from around the globe,
ranging from healthy wraps and salads to Thai and Italian,” said
Michael.
Time to complete:Oct 23 2006 - Oct 25 2006
Stv posted this on 27/10.
Link:http://www.macquariecentre.com.au
|
|

Centro Properties Group
Bankstown
October 2006
Client:Centro Properties Group
Project Management:Vegagroup
Brief:De-fit of ex Charlies Club Sandwich
tenancy
Info:Following Vegagroup’s successful
handover of the HJ restaurant at Centro in Bankstown, Centro’s assistant
project manager Tony Robertson requested for an urgent de-fit of the
ex Charlies Club Sandwich tenancy. The finish date was set at the end
of the month.
Time to complete:Oct 20 2006 - Oct 20 2006
James posted this on 21/10.
Link:http://www.centro.com.au
|
|

Hungry Jack's
Cabramatta
September 2006
Client:Hungry Jack's
Project Management:Clifton Development Consultants Pty Ltd
Construction Manager:Vegagroup
Site Supervisor:James
Brief:Store fit out following fire damage at HJ Cabramatta restaurant.
Info:The brief was simple; bring back the
store to previous operating conditions within a tight timeline. Hungry
Jack's Cabramatta store is situated at the corner of Cumberland Hwy and
Cabramatta Rd. A busy restaurant if you can imagine.
The fire damage was extensive, but not complete. The first thing was
to make the whole place safe by having the electricians check and isolate
electrical outlets and provide temporary power and lights for the works
to be carried out. Then of course, protect and cover the equipment from
the effects of dust & scratches as the works is being carried out.
A total debris clearance and removals off site was next on the list
to make way for phase 2.
The key challenge was the odour removal by decontaminating both the
contents and the structure in preparation for paint and relevant building
works.
Due to the nature of the job, the scope of work increased by 60 to
70% as the project progressed, but the delivery timeframe remained set
for 2 weeks. For example, the roof had to come off and the entire ceiling
had to be renewed etc.
Vegagroup carried out the project under a construction management agreement,
coordinating processes.
Trades required: Structural engineers, Fire cleaning specialists, Roofers,
Hydraulics, Mechanical & Air-conditioning, Plumbers, Gyprockers, Painters,
Electricians, Phone technicians, Computer etc.
Some of the contractors involved: Powell Mechanical, Channon Refrigeration,
Steamatic, Nutech Engineering.
Time to complete:Sep 29 2006 - Oct 25 2006
James posted this on 26/10.
Link:http://www.hungryjacks.com.au
|
|

Joe Khoury
Sydney Running Festival 1/2 Marathon
September 2006
Event:Sydney Running Festival 1/2 Marathon
Info:It is dubbed as one of the best runs
in the world. This half a marathon is also a fantastic way to raise much-needed
funds for charity (Major race sponsors are the National Heart Foundation
and the Australian Red Cross.)
On a beautiful sunny Sydney morning we took off from Milsons Point
at North Sydney at 06:30am crossing the Harbour Bridge and finishing
at the forecourt of the Opera House.
JK posted this on 17/09.
Links:http://www.sydneymarathon.org
http://www.blackmores.com.au
http://www.heartfoundation.com.au
http://www.redcross.org.au
|
|

Sydney Airport
Pronto! Valet Parking
September 2006
Client:Sydney Airport Corporation Ltd
Project Management:Sydney Airport Corporation
Architects:Maitland & Butler Pty Ltd
Brief:Pronto! Valet Car Park Profile
Upgrade.
Info:The Pronto! Valet and Car Wash were
originally built by Vegagroup just before the Olympics.
Six years on and Pronto! Valet
Parking was due for an upgrade to highlight its five star appeal. Vegagroup
delivered Structural work, Refurbishment, Painting (Pillars and floors),
Line marking, Flooring, Electrical & Lighting, Fittings, Office refurbishment,
Staff Amenities, glazing etc. Due to the nature of the upgrade process
and the required proposed facelift, a high degree of customisation
was put into operation to achieve the preferred results.
Next time you're
at Sydney Airport, simply drive into the forecourt on the Departures
level of Terminal 2 and turn left into the parking entrance, where
you can leave your car with Pronto! and collect it on your return to
Sydney.
Pronto! Valet provides a high quality service and an ultra convenient
product to domestic travellers. Signage upgrade for the whole project
was carried out by K & W Signs.
Time to complete:Sep 12 2006 - Nov 07 2006
Stv posted this on 10/11.
Link:http://www.sydneyairport.com.au
|
|

Wilson Parking / Sydney
P84
Cinema Centre / 521 - 527 Kent St.
August 2006
Client:Wilson Parking
Project Management:Vegagroup
Brief:Exterior signs refurbishment.
Info:This was a special project.
Our client
set a particular timeline following their strategic deployment of the
new corporate identity throughout WP car parks nationwide.
So you don't just
show up with your oversized crane and block the street until you
finish. Preparation were underway sometime before to acquire the proper
permissions from the relevant authorities (Our gratitude to the City
of Sydney Council & the Sydney
Police for their support.)
Moreover, all the trades involved needed to be scheduled to deliver
their bit all in a day's work. Keep in mind that the Cinema Centre car
park is a busy operation, considering it's a convenient and ideal location
to park your car and access the surrounding attractions such as the
IMAX Theatre, Queen Victoria Building, Darling Harbour, Chinese Garden,
George Street Cinemas etc.
Time to complete:Aug 16 2006 - Aug
16 2006
JK posted this on 17/08.
|
|

Construction / Parramatta
639 Church St.
August 2006
Client:Private investors
Project Management:Vegagroup
Brief:Design, construct & project manage a commercial and retail building at 639 Church Street.
Info:The construction begins at 639 Church
Street, a complete design, construct & project manage initiative by Vegagroup.
This is set to become a bright landmark for businesses in the local area.
639
Church Street will be the gateway to Parramatta from the North, setting a
precedent in architectural design for the area, which has long been overdue.
The timeframe for completion is set at four months to accommodate for the
pre-committed tenants. The available space is categorised as Commercial,
Industrial/Bulky goods.
Worksite Log 11/09/2006:Sydney's recently
being blessed with long awaited rainfall and naturally slowed the work on
the site a little.
So far the bulk excavation for the Basement is complete
with a total of over 100 truck loads being transported off site, each load
approx 12 tonnes.
Parramatta City Council's certifying team member John Barnes
lent his support during his pre-pour structural inspections. His instructions
were welcomed and all went well. Now the concrete placement for the footings & basement
detention tank is completed totalling 112m 3 of concrete for the footings.
Currently
construction work is underway on the retaining and internal walls in the
basement.
Worksite Log 28/11/2006:This building is taking shape very fast, we are out of the basement and the first slab is poured. The brick works for the first level is complete and formwork for the second slab is under way.
Time to complete:Aug 02 2006 - Active
Tony posted this on 03/08.
|
|

Wilson Parking / Sydney
P96 Goulburn St - Cnr Goulburn & Elizabeth St.
August 2006
Client:Wilson Parking Project Management:Vegagroup
Brief:Implement Wilson Parking's new corporate colours.
Info:The Goulburn St Parking Station occupies
a City block in the Southern CBD.
It was built in 1961 and has a capacity
of 750 parking spaces. As part of Wilson Parking's new corporate image, the
Goulburn St. Parking Station's upgrade was an intensive undertaking.
This
car park operates 7 days a week with long hours. This leaves
a tight window for our operation work, which consisted of colour coded painting,
line marking and signage.
Goulburn St. Carpark sits over the underground
portal for the City Circle which carries seven of the city's eleven suburban
rail lines.
It also serves a number of city highlights like Hyde Park, the
Anzac Memorial, World Square, Sydney Dental Hospital, Capitol Theatre, Chinatown,
Central Station, Downing Centre, Family Law Courts etc.
Signage:K & W Signs.
Time to complete:Aug 01 2006 - Aug 29 2006
JK posted this on 29/08.
|
|

Hungry
Jack's / Hoyts Centre
July 2006
Client: TPFA c/o Hungry Jack's
Brief:A provision for modifying walkways
access to HJ from BOH to FOH at the Hoyts Centre in Sydney.
Info:Work carried out after midnight.
Time to complete:Jul 12 2006 - Jul 13 2006
JK posted this on 14/07.
|
|
Harbour Foreshore Authority
July 2006
Client:Sydney Harbour Foreshore Authority
Brief:Works to be carried out as part of the parking equipment upgrade for Darling Harbour car parks.
Time to complete:Jul 01 2006 - Jul 02 2006
Nat posted this on 03/07.
|
|
Hungry
Jack's / Tuggernanong
June 2006
Client:Hungry Jack's Pty Ltd
Brief:Supply and install Corian front countertop
at the Tuggernanong restaurant.
Info:Work was performed after hours and the
restaurant was ready for business by the next day.
Time to complete:Jun 26 2006 - Jun 27 2006
JK posted this on 27/06.
|
|
Hungry
Jack's / Raymond Terrace
June 2006
Client:Hungry Jack's Pty Ltd
Brief:Tiling of entire outside eating area.
Time to complete: Jun 24 2006 - Jun 26 2006
JK posted this on 27/06.
|
|
Hungry
Jack's / Belmont
June 2006
Client:Hungry Jack's Pty Ltd
Brief:Tiling of entire outside eating area.
Time to complete: Jun 21 2006 - Jun 23 2006
JK posted this on 24/06.
|
|
Sydney
Airport
June 2006
Client:Sydney Airport Corporation Ltd
Brief:Civil works on bitumen areas at the Long Term car park.
Time to complete: Jun 14 2006 - Jun 14 2006
JK posted this on 15/06.
|
|
Wilson Parking / Sydney
June 2006
Client:Wilson Parking
Brief:Building of a car park attendant booth
at P150, O'Connell St Sydney.
Info:This involved timber work, windows, electrical & phone
cabling and painting. Our client request was for the job to be carried out
over the weekend so it's operational at the beginning of the week.
Time to complete: Jun 03 2006 - Jun 05 2006
Stv posted this on 06/06.
|
|
API Ltd / Bondi Junction
May 2006
Client:Australian Pharmaceutical Industries Ltd
Brief:At API's new Priceline locationMake
good of offices and remove excess debris.
Time to complete:May 22 2006 - May 22 2006
Nat posted this on 23/05.
|
|
Joe
Khoury / SMH 1/2 Marathon
May 2006
Event: SMH 1/2 Marathon
Info: Race started at 07:00am.
Time to complete: 1 hr 49 minutes.
JK posted this on 21/05.
|
|
Hungry
Jack's / Belmont
May 2006
Client: Hungry Jack's Pty Limited
Brief: Re-concrete and make good.
Info:Paint edges of opening, install reflective
strips on all light poles, straighten a light pole which was hit by a car.
Time to complete:May 19 2006 - May 19 2006
Stv posted this on 20/05.
|
|
Wilson Parking / Sydney
May 2006
Client:Wilson Parking
Brief:Part of an ongoing programme of improvements
at MLC car park.
Info:Walls, ceilings, islands, plinths and floors painted. Also line marking of the entire car park.
Time to complete: May 08 2006 - May 08 2006
Stv posted this on 09/05.
|
|

Hungry
Jack's / Greenacre
April 2006
Client:Hungry Jack's Pty Limited
Brief:Internal/external work with landscaping.
Info:Carried out landscaping and various maintenance works on roller shutters, drive thru, dining room ceilings and lights etc.
Time to complete:Apr 27 2006 - Apr 27 2006
JK posted this on 28/04.
|
|
Hungry
Jack's / North Sydney
April 2006
Client:Hungry Jack's Pty Limited
Brief:Completion of store closure.
Info:This included removing & clearing of all HJ items etc.
Time to complete:Apr 24 2006 - Apr 24 2006
Col posted this on 24/04.
|
|
API Ltd / Bondi Junction
April 2006
Client:Australian Pharmaceutical Industries Ltd
Brief: Electrical works for API's new Priceline location.
Info:Relocate electrical, distribution and mechanical boards.
Time to complete:Apr 21 2006 - Apr 21 2006
Stv posted this on 22/04.
|
|
Sydney
Airport
April 2006
Client:Sydney Airport Corporation Ltd
Brief:Civil works at the International Terminal car park.
Brief:Kerb removals, line marking etc.
Time to complete: Apr 13 2006 - Apr
25 2006
JK posted this on 20/04.
|
|
Hungry
Jack's / Bondi Junction
April 2006
Client:Hungry Jack's Pty Limited
Brief:Completion of store make good.
Info:This included the removal of all equipment,
furniture and signs and making good of all walls, ceilings and floors.
Time to complete:Apr 07 2006 - May 04 2006
Col posted this on 05/05.
|
|
Hungry
Jack's / Parramatta office
April 2006
Client:Hungry Jack's Pty Limited
Brief:Installation of mezzanine flooring.
Time to complete:Apr 01 2006 - Apr 02 2006
Col posted this on 03/04.
|
|

Wilson Parking / Sydney
P21
City Park - Cnr Kent, Market & Sussex St.
April 2006
Client:Wilson Parking Project Management:Vegagroup
Brief:Implement Wilson Parking's new corporate colours.
Info:Located in Sydney's City South, City
Park is always burgeoning with activities. Aside from catering for businesses
in the immediate area, City Park is surrounded with multi attractions such
as Darling Harbour, Cockle Bay, Sydney Aquarium, Queen Victoria Building
and Darling Park.
Considering the level of activities, the upgrade of the
car park colours & signage needed to be coordinated with minimum impact on
the day-to-day business operations. The new look refreshed this multi storey
car park. When you next visit City Park, your experience will be enhanced,
bringing parking in the CBD to a better level.
Signage:K & W Signs.
Time to complete:Apr 01 2006 - May 25 2006
Stv posted this on 25/05.
|
|

Sydney
Airport
March 2006
Client:Sydney Airport Corporation Ltd
Brief:Upgrade of the exterior and
interior of the waiting lounge at the Long Term car park.
Time to complete:Mar 08 2006 - Mar
25 2006
JK posted this on 25/03.
|
|
Wilson Parking / Sydney
March 2006
Client:Wilson Parking
Brief:Upgrade for 151 Clarence Street.
Info:Works included painting of specific areas to incorporate renewed corporate image.
Time to complete: Mar 23 2006 - Mar 23 2006
Stv posted this on 23/03.
|
|
Hungry
Jack's / Dubbo
March 2006
Client:Hungry Jack's Pty Limited
Brief:Renovation work on playground area.
Info:Dismantling of playground equipment and removing of soft fall flooring replacing with rubber flooring.
Time to complete:Mar 10 2006 - Mar 16 2006
Jk posted this on 17/03.
|
|
Sydney
Airport
February 2006
Client:Sydney Airport Corporation Ltd
Brief:Fit-out for Secure Parking's
airport office.
Time to complete:Feb 17 2006 - Feb
24 2006
JK posted this on 25/02.
|
|
Wilson
Parking / Parramatta
February 2006
Client:Wilson Parking
Brief:Civil works on Kendall and Harris Street
carpark.
Time to complete:Feb 06 2006 - Feb 07 2006
Stv posted this on 07/02.
|
|
Hungry
Jack's / Manly
January 2006
Client:Hungry Jack's Pty Limited
Brief:Tiling to match existing.
Info:Spanning over two nights, work had to be performed after midnight to minimise the impact on the store's operations.
Time to complete:Jan 16 2006 - Jan 17 2006
JK posted this on 17/01.
|
|
Hungry
Jack's / Wentworthville
January 2006
Client:Hungry Jack's Pty Limited
Brief:Urgently attending to a damaged ceiling in outside eating area.
Info:Made safe for the public followed by after-hours repair of the damage.
Time to complete:Jan 16 2006 - Jan 17 2006
JK posted this on 17/01.
|
|
|
Results
1 to 42 of 42 | page 1 of 1
|
|
|